Electricity without GHG emissions |
|
Increased production of electrical energy is a global reality and a Hybrid Power Plant is the right way to actually influence the reduction of greenhouse gases by using natural gas which has been accepted as the environmentally most acceptable energy source in the transition period leading to the complete decarbonization. | |
Read more | |
Electricity without GHG emissions | |
Increased production of electrical energy is a global reality and a Hybrid Power Plant is the right way to actually influence the reduction of greenhouse gases by using natural gas which has been accepted as the environmentally most acceptable energy source in the transition period leading to the complete decarbonization. | |
Read more | |
Capture and separation of CO2 | |
With the aim to achieve a complete project environmental acceptability, following the highest environmental standards, in cooperation with the Norwegian Research and Development Centre TCM in Mongstad, a facility for capturing and separating CO2 on the basis of amino processes has been developed, also known as the Post-Combustion Amine-Based CO2 Capture. | |
Read more | |
Capture and separation of CO2 | |
With the aim to achieve a complete project environmental acceptability, following the highest environmental standards, in cooperation with the Norwegian Research and Development Centre TCM in Mongstad, a facility for capturing and separating CO2 on the basis of amino processes has been developed, also known as the Post-Combustion Amine-Based CO2 Capture. | |
Read more | |
Production of green hydrogen by electrolysis |
|
In order to optimize thermal power plant work regimes and increase its efficiency and availability, the plan is to upgrade the system for hydrogen production – an electrolyser with the power of 17,5 MW, which will produce about 330 kg/h hydrogen in the conditions of reduced demand and low prices of electrical energy. | |
Read more | |
Production of green hydrogen by electrolysis | |
In order to optimize thermal power plant work regimes and increase its efficiency and availability, the plan is to upgrade the system for hydrogen production – an electrolyser with the power of 17,5 MW, which will produce about 330 kg/h hydrogen in the conditions of reduced demand and low prices of electrical energy. | |
Read more | |
IT data center | |
At the location next to the Hybrid Power Plant, it is planned to build a modern IT data center with a capacity between 30 - 60 MW with a constant consumption of electricity produced on site. The location itself, next to the hybrid power plant offers, in addition to absolute security of electricity supply, an excellent geostrategic position in the center of Croatia, next to larger cities near the three border countries (Hungary, Serbia and Bosnia and Herzegovina). | |
Read more | |
IT data centar | |
At the location next to the Hybrid Power Plant, it is planned to build a modern IT data center with a capacity between 30 - 60 MW with a constant consumption of electricity produced on site. The location itself, next to the hybrid power plant offers, in addition to absolute security of electricity supply, an excellent geostrategic position in the center of Croatia, next to larger cities near the three border countries (Hungary, Serbia and Bosnia and Herzegovina). | |
Pročitaj više | |
The advanced solutions of Delta Energetika Ltd. have proven that the application of science, new technologies and technical solutions can produce electricity from natural gas with emissions "close to zero". |
PROJECT IN FIGURES | ||
annual electricity production |
0 GWh |
annual amount of ecologically separated and disposed CO2 |
0 t |
annual hydrogen production |
0 t |
LATEST NEWS | ||
Tender opening |
On 17th of May 2022 Tender opening of Preliminary EPC Tender for Hybrid Power Plant Slavonski Brod has been conducted. |
Read more |
Meeting with representatives of TCM |
5th of May 2022 Delta energetika Ltd. representatives held a meeting with representatives of Technology Center Mongstad (TCM) in Norway and a visit to Carbon Capture Power Plant was held. |
Read more |
Construction license |
Construction license is obtained for the Combined gas cogeneration Slavonski Brod, nominal power 2 x 250 MW and heat power 25 MW ... |
Read more |
CONTACT | |
T: +385 1 469 4070 M: info@deltae.hr |
LOCATION | |
Kaptol 19 HR-10000 Zagreb Croatia |
MENU | |
About us About project News Promo |
CONTACT | ||
T: +385 1 469 4070 M: info@deltae.hr |
LOCATION | ||
Kaptol 19 HR-10000 Zagreb Croatia |
MENU | ||
About us About project News Promo |
@ 2023 Delta Energetika Ltd. All rights reserved. |
@ 2023 Delta Energetika Ltd. All rights reserved. |