In order to optimize thermal power plant work regimes and increase its efficiency and availability, the plan is to upgrade the system for hydrogen production – an electrolyser with the power of 17,5 MW, which will produce about 330 kg/h hydrogen in the conditions of reduced demand and low prices of electrical energy.

Hydrogen produced in such way will be stored as gas at the location and will enable the establishment of hydrogen market in Croatia and in the region. Depending on the needs and the market growth, hydrogen production upgrade is possible though modular system of electrolysis.
Hybrid Power Plant SB
In order to optimize thermal power plant work regimes and increase its efficiency and availability, the plan is to upgrade the system for hydrogen production – an electrolyser with the power of 17,5 MW, which will produce about 330 kg/h hydrogen in the conditions of reduced demand and low prices of electrical energy.

Hydrogen produced in such way will be stored as gas at the location and will enable the establishment of hydrogen market in Croatia and in the region. Depending on the needs and the market growth, hydrogen production upgrade is possible though modular system of electrolysis.
LATEST NEWS
Hybrid Power Plant SB
Tender opening
On 17th of May 2022 Tender opening of Preliminary EPC Tender for Hybrid Power Plant Slavonski Brod has been conducted.
Read more
Hybrid Power Plant SB
Meeting with representatives of TCM
5th of May 2022 Delta energetika Ltd. representatives held a meeting with representatives of Technology Center Mongstad (TCM) in Norway and a visit to Carbon Capture Power Plant was held.
Read more
Hybrid Power Plant SB
Construction license
Construction license is obtained for the Combined gas cogeneration Slavonski Brod, nominal power 2 x 250 MW and heat power 25 MW ...
Read more
OUR PARTNERS
CONTACT
T: +385 1 469 4070
M: info@deltae.hr
LOCATION
Kaptol 19
HR-10000 Zagreb
Croatia
CONTACT
T: +385 1 469 4070
M: info@deltae.hr
LOCATION
Kaptol 19
HR-10000 Zagreb
Croatia
@ 2023 Delta Energetika Ltd. All rights reserved.
@ 2023 Delta Energetika Ltd. All rights reserved.
CLOSE