Cookie Consent by Free Privacy Policy Generator
Hybrid Power Plant SB
At the location next to the Hybrid Power Plant, it is planned to build a modern IT data center with a capacity between 30 - 60 MW with a constant consumption of electricity produced on site. The location itself, next to the hybrid power plant offers, in addition to absolute security of electricity supply, an excellent geostrategic position in the center of Croatia, next to larger cities near the three border countries (Hungary, Serbia and Bosnia and Herzegovina).
Hybrid Power Plant SB
At the location next to the Hybrid Power Plant, it is planned to build a modern IT data center with a capacity between 30 - 60 MW with a constant consumption of electricity produced on site. The location itself, next to the hybrid power plant offers, in addition to absolute security of electricity supply, an excellent geostrategic position in the center of Croatia, next to larger cities near the three border countries (Hungary, Serbia and Bosnia and Herzegovina).
LATEST NEWS
Hybrid Power Plant SB
Tender opening
On 17th of May 2022 Tender opening of Preliminary EPC Tender for Hybrid Power Plant Slavonski Brod has been conducted.
Read more
Hybrid Power Plant SB
Meeting with representatives of TCM
5th of May 2022 Delta energetika Ltd. representatives held a meeting with representatives of Technology Center Mongstad (TCM) in Norway and a visit to Carbon Capture Power Plant was held.
Read more
Hybrid Power Plant SB
Construction license
Construction license is obtained for the Combined gas cogeneration Slavonski Brod, nominal power 2 x 250 MW and heat power 25 MW ...
Read more
OUR PARTNERS
CONTACT
T: +385 1 469 4070
M: info@deltae.hr
LOCATION
Kaptol 19
HR-10000 Zagreb
Croatia
CONTACT
T: +385 1 469 4070
M: info@deltae.hr
LOCATION
Kaptol 19
HR-10000 Zagreb
Croatia
@ 2023 Delta Energetika Ltd. All rights reserved.
@ 2023 Delta Energetika Ltd. All rights reserved.
CLOSE